Keywords:

Coal Getting, Excavator, Match Factor, Produktivitas

Abstract

PT. Lautan Hutan Lestari is a coal mining company operating in Lemo Village, Central Kalimantan. The company targets production in May 2024 of 98.852 tonnes with an hourly target of 130 tonnes/hour. The actual coal production data shows production of 62.206 tonnes, the achievement of production is only 62,92% of the planned target. This study aims to increase the productivity of the coal getting unit, analyse the factors that cause the non-achievement of Komatsu PC 300 excavator productivity and provide improvement efforts to meet the planned production targets. Equipment analysis was carried out on a combination of mechanical tools used during the study, namely Excavator Komatsu PC 300. The research method used in this research is quantitative method. There are 2 scenarios that can be used to increase tool productivity in coal getting activities. Scenario 1 is a reduction in avoidable obstacle time to increase work efficiency so that productivity becomes 169,55 Tonnes/hour, this scenario has reached the production target but can still be improved. Scenario 2 is an improvement in obstacle time to increase work efficiency and fleet matching with the addition of conveyance units so that the resulting productivity can increase significantly by 222,22 Tonnes

Keywords    : Coal Getting., Excavator, Match Factor, Productifity

References

Achmad Aisyar (2023) Evaluasi Produktivitas Alat Gali Muat dan Alat Angkut pada Pada Kegiatan Coal getting dalam Upaya Pencapaian Target Produksi Bulanan di PT Mitra Barito Lumbung Energi Pada Front Timur Site Maharu Jobsite PT Kalimantan Prima Nusantara Kalimantan Tengah.

Ahmad Kholil (2012) Alat Berat, Bandung : PT.Remaja Rosdakarya

Alifa, A., Gusman, M., & Prabowo. H., (2018) Optimasi Alat Gali Muat dan Alat Angkut Terhadap Produksi Batubara dengan Metode Kapasitas Produksi dan Metode Teori Antrian pada Pit Taman Periode Oktober 2016 Unit Pertambangan Tanjung Enim PT. Bukit Asam (Persero) Tbk. Bina Tambang, 3 (2), 807-818. (2018)

Andi, S. (2019) Optimalisasi Produksi Alat Muat Dan Alat Angkut Untuk Pemindahan Batubara Pada Operasi Penanganan Batubara 4 Satker Penbara Blok Timur di Pt. Bukit Asam Tbk, Kabupaten Muara Enim, Sumatera Selatan Other Thesis, Thesis, Universitas Pembangunan Nasional Veteran Yogyakarta.

Anonim.(2024). Departemen Production and Enginering PT. Lautan Hutan Lestari

Anugrah Ariansyah (2023) Kajian Teknis Produksi Alat Gali Muat dan Alat Angkut Untuk Mencapai Target Produksi batubara di PT. Surya Anugrah Sejahtera.

Eddy Winarno, Inmarlinianto, Aldi Suretno.(2018) Kajian Teknis Produksi Alat Muat dan Alat Angkut pada Pengupasan Overburden Tambang Batubara di PT Mandiri Intiperkasa, Kalimantan Utara Jurnal Teknologi Pertambangan Vol. 4 No. 2 Periode September 2018 - Februari 2019

Fernandes, R., & Yulhendra, D. (2022). Optimalisasi Produksi Batubara Pada Proses Coal getting Di Pit 3 PT. Jambi Prima Coal, Kecamatan Mandiangin, Kabupaten Sarolangun, Provinsi Jambi. jurnal bina tambang, 28-38.

Gusman, M dan Agustino, Y. (2018). Evaluasi Optimalisasi Alat Gali Muat Dengan Metoda Overall Equipment Effectiveness (OEE) Untuk Memenuhi Target Produksi Batubara Bulan Maret 2018 di Pit 1 Utara Bangko Barat PT.Bukit Asam Tbk, Tanjung Enim Sumatera Selatan. Jurnal Bina Tambang, Vol 3, No.4, Januari 2019.

Hartman, H.L. dan Mutmansky, J.M. (2002). Itroductory Mining Engineering. John Wiley & Sons.

Heizer, J. dan Render, B. (2006). Operations Management.7th Edition. New Jersey: Pearson Education,Inc.Upper Saddle River.

Hustrulid, W., M. Kuchta dan R. Martin. (2013). Open Pit Mine Planning & Design 3rd Edition. Boca RaTon: CRC Press.

Kadir, E. (2008). Pemindahan Tanah Mekanis. Palembang: Universitas Sriwijaya.

Kementerian Energi dan Sumber Daya Mineral. (2023). Handbook of energy & economic statistics of Indonesia 2023. Kementerian ESDM.

Indonesianto, Yanto. (2016). Pemindahan Tanah Mekanis. Penerbit Seri Tambang Umum, Jurusan Teknik Pertambangan. Sekolah Tinggi Teknologi Nasional.

Komatsu. (2019). Spesification & Application Handbook Edition 32. Komatsu All Rights Reserved Printed in Japan

Peurifoy, R.L. (2006). Construction Planning, Equipment, and Methods. Boston: McGraw Hill.

Pfleider, Eugene P., (1972), Surface Mining 1st Edition, The American Institute of Mining, Metallurgical and Petroleum Engineers, New York

Putrawiyanta, I. P., & Ambeng, R. R. (2025). Pengamatan Kegiatan Coal Getting PIT 2 di PT. Dayak Membangun Pratama, Kecamatan Kurun, Kabupaten Gunung Mas Provinsi Kalimantan Tengah. Innovative: Journal Of Social Science Research, 5(1), 5767–5780. https://doi.org/10.31004/innovative.v5i1.17464

Putrawiyanta, I. P., Nadeak, R., & Nababan, I. (2024). Produktivitas Alat Gali Muat Dan Angkut Pada Kegiatan Overburden Removal Dan Coal Getting. Jurnal Teknika: Jurnal Teoritis dan Terapan Bidang Keteknikan, 8(1), 15-20.

Prodjosumarto, P. (1993). Pemindahan Tanah Mekanis. Bandung: Institut Teknologi Bandung.

Rochmanhadi. (1992). Alat-Alat Berat dan Penggunaannya. Jakarta. Departemen Pekerjaan Umum

Rumidi, Sukandar. (2008). Batubara dan Gambut. Yogyakarta: Gadjah Mada University Press.

Supriatna, S. dan Sudrajat, A. (1995). Geological Map of the Muara Tewe Quadrangle, Kalimantan. Geological Research and Development Centre, Bandung.

Siahaan, R. (2017).Proses Penambangan Batubara. Diakses dari https://kupdf.net/download/prosespenambanganbatubara_59e5214808bbc58 d65e653de_pdf#. Diakses pada anggal 10 Desember 2024.

Tenriajeng, Andi Tenrisukki. (2003). Pemindahan Tanah Mekanis. Jakarta: Gunadarma

Toha, M. T., Juniah, R., & Yusuf, M. (2022). Optimalisasi Pemberaian Overburden Dengan Metode Ripping dan Peledakan di Banko Barat PT Bukit Asam Tbk. Jurnal Teknologi Mineral Dan Batubara, 18(1), 13−22.

Downloads

Published

2025-08-17

How to Cite

Simamora, A., Putrawiyanta, I. P., Iashania, Y., Wiryanto, Y. H., & Fridtriyanda, A. (2025). Analisis Produktivitas Excavator Komatsu PC 300 Pada Kegiatan Coal Getting Di PT. Lautan Hutan Lestari Kecamatan Teweh Tengah Kabupaten Barito Utara Provinsi Kalimantan Tengah . Innovative: Journal Of Social Science Research, 5(4), 8750–8762. https://doi.org/10.31004/innovative.v5i4.20924

Similar Articles

<< < 5 6 7 8 9 10 11 12 13 14 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>