Pengendalian Parameter Produktivitas pada Rekonstruksi Jalan Rigid berdasarkan Jadwal LOB (Line Of Balance) (Studi Kasus : Proyek Rekonstruksi Jalan Penganten – Ngampal)

Authors

  • Ichwan Hadi Saputra Universitas Bojonegoro
  • Fadhil Zaid Al Ma’ruf Universitas Bojonegoro
  • Toni Budi Santoso Universitas Bojonegoro

DOI:

https://doi.org/10.31004/innovative.v5i4.19914

Keywords:

Line Of Balance (LOB), Productivity, Road Reconstruction

Abstract

In the world of construction, there is repetitive work. For projects with similar elements, scheduling is needed that can meet resource needs in a sustainable and orderly manner without obstacles. The purpose of this research is to calculate the amount of Labor, Materials and Equipment required to achieve the specified schedule on the Penganten - Ngampal Road Reconstruction project using the Line Of Balance (LOB) method. The steps taken include conducting interviews and collecting project data in the form of RAB, Time Schedule, MC 0 / MC 100 which are then processed into a Line Of Balance (LOB) diagram. The results of the productivity analysis, labor requirements include 362 workers, 206 fitters and 113 foremen. Material requirements include Aggregate A, Liquid Asphalt/Emulsion Bonding Layer, Wear Layer Laston, Structural Concrete fc' 10 - 30 MPa, Formwork Plate, Polytene, Curing Compound, Joint Sealant, Expansion Cap (3/4“ Pipe), Reference Wood, Multiplex, Nails, 2” Pipe, Plain and Fin Reinforcing Steel, Concrete Wire, Painting, Selected Materials, Woven Steel Wire. Meanwhile, for equipment Excavator, Dump Truck, Bulldozer, Tandem, Water Tanker, Baby Vibrator Roller, Motor Grader, Chainsaw, Track Loader, Hand Auger Drill, Concreter Vibrator.

References

Alexander, A. (2020). Rekonstruksi Pemeliharaan Preservasi DanOptimalisasi Perkerasan Jalan. Material Komposit, http://eprints.itenas.ac.id/1006/5/05 Bab 2 222014019.pdf

Faradila, A. (2023). ANALISIS PENGENDALIAN WAKTU DENGAN METODE LINE OF BALANCE PADA PROYEK KONSTRUKSI REPETITIF (STUDI KASUS : PROYEK PEMBANGUNAN JALAN TOL CIBITUNG – CILINCING SEKSI 4). 03.

Gondokusumo, O., & Lythio, S. A. (2022). Penerapan Line of Balance Dengan Target Waktu Penyelesaian Proyek Untuk Optimasi Penjadwalan Proyek Rumah Tinggal. JMTS: Jurnal Mitra Teknik Sipil, 5(4), 845-856. https://doi.org/10.24912/jmts.v5i4.20607

Halimi, J. (2020). Analisis Penjadwalan Ulang Dengan Menggunakan Metode LSM (Linier Scheduling Metod/Line Of Balance). Jurnal Ekonomi Volume 18, Nomor 1 Maret201, 2(1), 41–49.

Kalia, S. M., Utiarahman, A., & Tuloli, M. Y. (2022). PENERAPAN METODE LINE OF BALANCE PADA PROYEK KONSTRUKSI REPETITIF (STUDI KASUS : PERUMAHAN GRIYA TUNAS MANDIRI). Jurnal Penelitian Jalan Dan Jembatan, 2(2), 35–46. https://doi.org/10.59900/ptrkjj.v2i2.85

Kartika, N., Robial, S. M., & Pratama, A. (2021). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Kolom Di Proyek Pembangunan Gedung Pemda Kabupaten Sukabumi. Jurnal Momen Teknik Sipil, 3(2), 103. https://doi.org/10.35194/momen.v3i2.1207

Natalia, M., Adibroto, F., Hamid, D., Muluk, M., & Dinna, R. (2019). Analisa Harga Satuan Pekerjaan Beton Bertulang Berdasarkan Analisa Pada Proyek Dan Analisa Harga Satuan Pekerjaan (AHSP) SNI 2016 Pada Proyek Pembangunan Aeon Mixed Use Project Phase II-Apartemen 3 Sentul City Bogor. Jurnal Ilmiah Rekayasa Sipil, 16(2), 92–102. https://doi.org/10.30630/jirs.16.2.222

Pratiwi, Y. (2022). Penggunaan Line of Balance Pada Perkerasan DI PROYEK PEMBANGUNAN JALAN TOL TEBING TINGGI – INDERAPURA.

Sinaga, J. U. (2023). ANALISIS HARGA SATUAN PEKERJAAN METODE AHSP 2016 DAN METODE AKTUAL PROYEK PEMBANGUNAN APARTEMEN PRINCETON MEDAN SKRIPSI OLEH : JOSUA UNTUNG SINAGA FAKULTAS TEKNIK UNIVERSITAS MEDAN AREA MEDAN ANALISIS HARGA SATUAN PEKERJAAN METODE AHSP 2016 DAN METODE AKT.

Sinaga, R., & Simanjuntak, P. (2020). Analisis Dan Penerapan Metode Line of Balance Pada Proyek Repetitif (Studi Kasus: Proyek Pembangunan Gedung Kementerian Keuangan Bandar Lampung). Journal CENTECH, 2(2), 30–41.

Verolio, & Pamadi, M. (2023). Analisa Penjadwalan Metode Linier Scheduling Method atau Line of Balance ( LSM / LOB ) Perumahan Devely Residence Kota Batam. Civil Engineering and Architecture Journal, Vol 1(No 1), 1–10. https://doi.org/10.37253/leader.v1i1.7661

Wildan Firdaus, B. W. (2023). ANALISIS PENGENDALIAN WAKTU PROYEK DENGAN METODE LINE OF BALANCE (LOB) PADA PROYEK PERUMAHAN CENTRAL PARK MIDDLE EAST RING ROAD. 5(2), 851–865.

Downloads

Published

2025-07-12

How to Cite

Saputra, I. H., Al Ma’ruf, F. Z., & Santoso, T. B. (2025). Pengendalian Parameter Produktivitas pada Rekonstruksi Jalan Rigid berdasarkan Jadwal LOB (Line Of Balance) (Studi Kasus : Proyek Rekonstruksi Jalan Penganten – Ngampal). Innovative: Journal Of Social Science Research, 5(4), 1562–1576. https://doi.org/10.31004/innovative.v5i4.19914

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.