Pengamatan Kegiatan Coal Getting PIT 2 di PT. Dayak Membangun Pratama, Kecamatan Kurun, Kabupaten Gunung Mas Provinsi Kalimantan Tengah

Authors

  • I Putu Putrawiyanta Universitas Palangka Raya
  • Rafvie Resido Ambeng Universitas Palangka Raya

DOI:

https://doi.org/10.31004/innovative.v5i1.17464

Keywords:

Work efficiency, Effective working time, Coalgetting

Abstract

PT Dayak Membangun Pratama is a company engaged in coal mining located in Tumbang Manyangan Village, Tumbang Tambirah, and Penda Pilang, Kurun and Tewah Districts, Gunung Mas Regency, located in Central Kalimantan with an area of 4,88.17 hectares of Borrowing Permit for Use of Forest Area (IPPKH) from the Ministry of Forestry with Decree (SK) Number 24/1/IPPKH/PMDN/2016 with an area of 999.95 hectares. The validity period of the production operation IUP is for 20 (twenty) years starting from November 29, 2011 to November 28, 2031. From the results of observations on seam B3, the time required for the coal getting activity was 4.19 hours with a coal volume of 125.99 tons. So that the productivity of coal getting on seam B3U[1] is 30.07 tons/hour. On seam B1 and Fault B1, the time required for coal getting activities is 3,143 hours with a coal volume of 134.5 tons. So that the productivity of coal getting on seam B1 and Fault B1 is 42.8 tons/hour. In the B23L seam, B23U fault and B3U fault, the time required for coal getting activities is 5.57 hours with a coal volume of 167.62 tons. So the productivity of coal getting on seam B23L, Fault B23U and Fault B3U is 30.01 tons/hour.

References

Ananda, A. D. 2023. Analisis Coal Losses Dari Proses Coal Getting Untuk Meningkatkan Nilai Coal Mining Recovery Di Pit Alam 1-3 PT. Muara Alam Sejahtera, Desa Muara Maung Kecamatan Merapi Barat, Kabupaten Lahat, Provinsi Sumatera Selatan (Doctoral dissertation, Universitas Negeri Padang).

Aljack, A. A., Putrawiyanta, I. P., & Saptawartono, S. 2023. Analisis Kesesuaian Pemanfaatan Air Pada Lubang Bekas Tambang Pasir di Daerah Kelurahan Sei Gohong Kecamatan Bukit Batu Kota Palangka Raya Provinsi Kalimantan Tengah. Innovative: Journal Of Social Science Research, 3(5), 10158-10172.

Balinov, I. M., Samsonov, G. N., Balykov, V. M., Paramonov, V. I., & Demyashkin, N. M. 1977. Feed system of a coal getting combine.[11 claims] (No. US 4025120).

Charmbury, H. B. 2019. Coal and the Environment. In Coal Surface Mining (pp. 71-75). Routledge.

Candra, K., Maessa, I., Helfindo, A., & Oktantyo, G. 2022. OPTIMASI BATUBARA SIDE-WALL PIT 5 Ext SEBAGAI UPAYA KONSERVASI PT. ARUTMIN INDONESIA SITE ASAMASAM. Prosiding Temu Profesi Tahunan PERHAPI, 57-68.

Hakim, A., Dwiatmoko, M. U., & Melati, S. 2021. Review Kemajuan Tambang Bulan November 2019 dan Perencanaan Tambang Bulan Desember 2019 di Tambang Terbuka Batubara. Jurnal Geomine, 8(3), 181. Hadisusanto, Nugroho. 2011. Aplikasi Hidrologi, Malang, Jogja Media Umum.

Haryes, H. P. 2022. Evaluasi Keserasian Kerja Alat Gali Muat Excavator Volvo EC330Blc dan Alat Angkut Dumptruck Mercedes Benz Axor 2528 C untuk Mencapai Target Produksi Batu Bara 38.507, 04 Ton pada Bulan Juni 2022 di Area Seam B PT. Pancaran Surya Abadi, Kalimantan Timur (Doctoral dissertation, Universitas Negeri Padang).

Muchlis, A. N., Afandi, W., & Kurniawan, S. 2022. Optimalisasi Floor Batubara Pada Kegiatan Coal Getting Di Pit KG PT. Borneo Indobara Tahun 2021. Prosiding Temu Profesi Tahunan PERHAPI, 323-332.

Ordin, A. A., Klishin, V. I., & Liskovets, S. A. 1998. Influence of rate of coal getting and rate of development workings on optimal dimensions of a mine panel. Journal of Mining Science (English Translation), 34.

Putrawiyanta, I. P. 2024. PERHITUNGAN VOLUME DENGAN PERMODELAN SOFTWARE TERRAMODEL TERHADAP STOCKPILE BATUBARA: VOLUME CALCULATION USING TERRAMODEL SOFTWARE MODELING ON COAL STOCKPILE. JURNAL TEKNIK PERTAMBANGAN, 24(1), 1-9.

Prabowo, H., Premana, H., & Amrina, E. 2023. Keserasian Kerja Alat Gali Muat Excavator Volvo Ec330 Blc Dan Alat Angkut Dump Truck Mercedes Benz Axor 2528 C Pada Kegiatan Coal Getting Seam B. Jurnal Sains dan Teknologi: Jurnal Keilmuan dan Aplikasi Teknologi Industri, 23(1), 86-98.

Putrawiyanta, I. P., Taruna, Y., & Lauriandro, A. A. 2023. Perhitungan sumberdaya batubara pada PT. Fontana Resources Indonesia, Kabupaten Barito Utara, Kalimantan Tengah. Angkasa: Jurnal Ilmiah Bidang Teknologi, 15(1), 45-54.

Quiggin, J. 2020. Getting off coal.

Wijaya, R. A. E., & Pangacella, B. 2020. Optimalisasi Produksi Pada Penambangan Batubara Di PT. Natural Artha Resources Simpang Niam. Mining Insight, 1(02), 233-244.

Yenni, F. R., & Prabowo, H. 2021. Management Pengendalian Kualitas Batubara Berdasarkan Parameter Kualitas Batubara Mulai Dari Front Sampai Ke Stockpile Di PT. Budi Gema Gempita, Merapi Timur, Lahat, Sumatera Selatan. Bina Tambang, 6(1), 110-120.

Zakwan, H., & Prabowo, H. 2021. Pengendalian Kualitas Batubara Seam 300 Berdasarkan Parameter Kualitas Batubara Dari Front Sampai Ke Buyer Di Pt Kuansing Inti Makmur, Job Site Tanjung Belit, Bungo, Jambi. Journals Mining Engineering: Bina Tambang, 6(5), 68-76.

Downloads

Published

2025-01-30

How to Cite

Putrawiyanta, I. P., & Ambeng, R. R. (2025). Pengamatan Kegiatan Coal Getting PIT 2 di PT. Dayak Membangun Pratama, Kecamatan Kurun, Kabupaten Gunung Mas Provinsi Kalimantan Tengah. Innovative: Journal Of Social Science Research, 5(1), 5767–5780. https://doi.org/10.31004/innovative.v5i1.17464

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1 2 > >>